Terms
Same-week rank
The rank of this week's value among 11 values: this week and the same week in each of the past ten years, sorted from highest to lowest.
Reduction rate
The assumed percentage decrease from the original consumption rate. 0% means the original rate is kept.
Minimum level
The lowest managed value for the stock level. The date a curve reaches the minimum level is the date that scenario needs replenishment.
Planned and completed
The number of items each division is scheduled to finish and the number finished so far. Completion rate is completed divided by planned.
Regional statistics
Cities are grouped by region, and the mean, maximum and minimum are calculated for each group.
Fixed layout
Columns, order, fonts and page layout are the same in every issue. Only the data changes.
Problem
Before
- Each week, values for the same week of the past ten years are looked up from several sources and entered one by one.
- Ranks and statistics are calculated by hand, and the report layout and charts are adjusted manually.
After
- A program reads each source and calculates the rank of this week's value among the ten-year same-week values.
- It produces a ranking table, a bar chart and a regional statistics table in the fixed layout.
Before
- Each reduction scenario is calculated separately in a spreadsheet, and the chart is pasted over the historical curves.
- The date each scenario reaches the minimum level is found by scanning columns.
After
- Starting from the current stock level, it projects the stock level for the coming months at each reduction rate.
- Scenario curves and actual curves from the same period in past years are drawn on one chart, and the date each scenario reaches the minimum level is calculated.
Before
- Planned and completed counts reported by each division are entered into the summary table by hand, and percentages and totals are calculated manually.
- The spreadsheet, document and PDF versions are prepared separately and must share the same layout.
After
- After the planned and completed counts of each division are entered, a program calculates percentages and totals.
- It produces the spreadsheet, document and PDF in the fixed layout.
Workflow
Interactive demos
Demo 1: Multi-source weekly report
Demo 2: Historical trend curves
Demo 3: Progress summary table generator
Outcome and technology
Consistent layout
Columns, charts and page layout are the same in every issue. Only the data changes.
Fixed calculation rules
Ranks, percentages, totals and the date each scenario reaches the minimum level are calculated by a program. The same data gives the same result on every run.
Scheduled runs
A scheduler reads the data and produces the reports at a fixed time. Output files are named by date.